Kitchens for Side Return Extensions
A side return extension fills the narrow strip of land beside the back of a Victorian or Edwardian terrace and can turn a cramped galley into a kitchen-diner. At Kitchen Bee Design, we design the kitchen inside it with your architect, while the extension is still on paper, then supply and fit it with our own team.


What a side return kitchen extension changes
Many terraced houses in London have the same layout at the back: a narrow kitchen in the back addition, with an outside passage running alongside it. Building over that passage often adds only a modest strip of width, but it changes what the room can hold. A galley with cabinets on one or both sides can become a room with an island, a proper dining area, and light coming in from above instead of from a single window.
In an Edwardian house in Ealing, our clients had a dark, narrow galley kitchen. Extending to the side by just over a metre, and slightly further at the rear, created a generous open-plan space with room for a central island, which now carries the hob. See the side and rear extension in Ealing.
The width you gain sets the limits. Whether an island fits, or the room works better with a long run of cabinets and a table, comes down to the measurements of your side return. When the side and the rear are extended together, as in Ealing, there can be room for a dining or sitting area as well; our page on the open-plan kitchen-diner looks at how to plan that space.
Plan the kitchen before the drawings are fixed
A side return is a small building with a lot of glass, and most of its details affect the kitchen. These are the decisions we like to settle with your architect early:
- Glass and rooflights. A side return usually takes its light from the roof. How far the glazing comes down the walls decides how much wall is left for tall units and wall cabinets.
- The tall run. The fridge, ovens and larder usually need a stretch of solid wall, and choosing which wall that is shapes the rest of the layout.
- Sink position. An island sink needs a waste pipe laid under the new floor, which is much simpler to plan before the slab goes in.
- Extraction. Ducting from the hob has to reach the outside, so its route is set together with the roof and the walls.
- Floor levels. If the floor of the extension sits higher or lower than the house, a step has to go somewhere, and the kitchen is planned around it.
The earlier the kitchen is in the drawings, the more of these stay open. In West Ealing, the family first came to us about the kitchen layout. It became clear that a new extension would open up the whole ground floor, so we brought in the architect Brown Urbanism and tested seven or eight layouts before settling on one. See the West Ealing ground-floor extension.
What drives the cost of a side return kitchen
The design, the cabinetry and installation by our own team, with worktops and appliances chosen separately and added to that figure.
Once worktops and appliances are in, for a small kitchen.
Typical for a decent-sized kitchen, depending on specification.
On top of the kitchen, and not deducted from it.
Should you want us to run the building work too, our project management of the building work is 10% of what the build costs, with a minimum fee.
Send us the drawings using the form below and we can go through them in a free 30-minute design consultation on Zoom. We are on 07590 406 007 and at mioko@kitchenbeedesign.com.
Frequently Asked Questions
It is a single-storey extension built into the narrow side passage beside the back addition of a terraced house, usually to widen the kitchen. Many are combined with a rear extension, which is often called a wraparound.
Some single-storey side extensions to houses can be built under permitted development, within size limits. In a conservation area, side extensions need planning permission, and so does any extension to a flat or maisonette. The Planning Portal and your local council can confirm what applies to your house.
If the work involves a shared wall or digging foundations close to your neighbour’s, the Party Wall etc. Act 1996 requires you to give them notice. Your architect or a party wall surveyor can advise.
As early as you can, ideally while the architect is still drawing. The decisions listed above get harder to change once the plans are fixed and the builder has started.